As AI server products accelerate their generational shift and demand higher-frequency, higher-speed transmission, the upgrade cycle for copper-clad laminate (CCL) materials in the PCB upstream supply chain has become firmly established. M7 and M8 specs are now mainstream, while M9 and M10 materials remain in the testing and validation stage, with mass production expected in 2027 or 2028.
Elite Material, TUC race ahead in AI CCL push
21
Jul