META Green Cooling Technology (MGC) president Clyde Chu said Nvidia’s chip roadmap shows that cooling requirements are doubling in less than a year, with the NVL72 rack based on the Vera Rubin architecture, expected in the second half of 2026, requiring 130-140 kW of cooling capacity per rack. By 2027, the Vera Rubin Ultra platform could push single-rack power consumption to 200-300 kW.
Tech Forum 2026: AI server racks push liquid cooling into mainstream
20
May